Illustration of stainless steel braid and different PTFE liner constructions

Comparing PTFE Braided Hose Quotations: What Must Match in the Assembly BOM

Published Updated Technical author

Compare quotations against the same complete hose assembly and delivery scope. Match the PTFE liner, bore, braid, both end connections, finished length, required operating conditions, inspection, documents and packaging. Record every exception before comparing totals. An unspecified item is an open question, not evidence that the supplier has included it.

A price per metre can describe bulk hose. A price per assembly may include fittings, assembly work and an agreed inspection package—or omit some of them. A useful comparison therefore starts with an approved bill of materials (BOM), supported by the drawing and purchase requirements. The objective is to identify comparable offers, then choose among them on price, delivery and other purchasing priorities.

Comparable quotation scopeCompare offers only after the scope is aligned.Assembly BOMService requirementsTests and documentsCommercial scope
Compare offers only after the scope is aligned.

Define one quotation baseline

Give every bidder the same drawing revision, assembly quantity and operating-condition sheet. Identify which requirements are mandatory, which permit an approved alternative and which are optional. Ask suppliers to reference those documents explicitly. A quotation for an earlier revision should remain outside the final comparison until its scope is corrected.

For an existing design, use the approved assembly identification and dimensions. Establishing replacement interfaces or measuring an installed hose is a separate engineering task. This comparison begins after that definition exists; it does not establish interchangeability from a photograph or nominal connection size.

Industry ordering systems illustrate why a hose description needs several fields: Aflex lists the liner, reinforcement, protection and connections separately in its Corroline+ ordering guidance. These are examples of specification categories, not evidence that different manufacturers’ components are interchangeable.

Use a BOM that separates the liner, reinforcement and ends

Ask for an identifiable hose construction rather than accepting “PTFE with stainless steel braid” as a complete specification. Record the liner grade and bore form, actual dimensional requirements, braid material and construction, and any outer protection. Colour alone does not establish a liner’s electrical properties. Any required electrical behaviour needs its own specification and confirmation.

Describe end A and end B separately. Include their connection designation, sealing arrangement, wetted materials and approved part or drawing reference. The required hose-to-fitting combination must be reviewed as an assembly. A familiar connection label does not establish that the hose tail, ferrule and assembly process are suitable together. See the PTFE connection guide for connection-specific considerations.

The following worksheet can be copied into an RFQ or comparison sheet. Fill the requirement column before issuing the enquiry; ask each supplier to complete its offer and exception columns. “Not required” should be an explicit buyer decision.

Fillable assembly BOM and quotation-scope worksheet
Line itemBuyer requirement / referenceSupplier offer / referenceIncluded, optional or excluded?
Assembly identityDrawing ___ Rev ___; quantity ___Quotation ___ Rev ______
PTFE linerGrade ___; bore form ___; ID / wall specification ___Hose model / technical sheet ______
Reinforcement and coverBraid material / construction ___; protection ___Material / construction ______
End AConnection / material / sealing reference ___Part number / drawing ______
End BConnection / material / sealing reference ___Part number / drawing ______
Completed geometryFinished length / tolerance / drawing datum ___Offered geometry and reference ______
Service confirmationOperating-condition sheet ___ Rev ___Assembly suitability response / limitations ______
Inspection and testingProcedure / acceptance / sampling ___Method, coverage and record ______
Documents and identificationRequired records / lot or assembly ID ___Deliverables and traceability link ______
Cleanliness and packingCleaning / drying / caps / packaging ___Confirmed scope ______
Commercial basisCurrency / delivery destination / required date ___Validity / charges / delivery basis ______

Compare the stated service envelope, not one pressure number

Attach the same media, concentration, continuous and peak temperature, operating pressure, transients, vacuum and movement requirements to each enquiry. Request a response for the complete offered assembly. The commercial check is whether both suppliers answered the same requirement and disclosed limitations—not whether one catalogue displays a larger number.

A burst figure, a production test condition and an operating rating answer different questions. Do not substitute one for another in the comparison sheet. If the service response is missing, mark the offer “technical clarification required”; procurement should not invent a derating factor. The PTFE pressure-selection guide covers the underlying selection factors.

Make inspection and document deliverables explicit

“Tested” is incomplete without a defined method and acceptance requirement. Ask which finished units are covered, what record is delivered and how the record identifies the supplied assembly. If a test is required, the applicable procedure should define its medium, conditions, duration and acceptance criteria. The values must be appropriate to the specific construction; this article does not prescribe them.

Swagelok’s Hose and Flexible Tubing catalogue separates testing and cleaning information by hose series. That is a useful example of explicit scope; its procedures are not Pengrowth commitments or universal acceptance rules.

List each requested document by name and purpose. A material declaration, dimensional report and assembly test record are different deliverables. Clarify whether a document relates to raw material, a production lot or each finished assembly. If a particular certificate or third-party inspection is required, obtain written availability and scope confirmation before treating it as included.

Cleaning, drying and protective packaging also need a defined scope where they matter to the application. End caps do not by themselves demonstrate a specified cleanliness level. Request the relevant procedure and acceptance basis instead of interpreting “clean packed” as an unqualified process guarantee.

Worked example: resolve omissions before ranking offers

Illustrative scenario only: a buyer requests finished assemblies to drawing H-101, revision C, with identified ends, a specified inspection record and protective end caps. The two responses below are invented to demonstrate a review method. They are not actual supplier quotations, prices, test results or statements of Pengrowth capability.

Hypothetical comparison of two incomplete responses
RequirementOffer AOffer BBuyer action
Complete assembly to Rev CRev C referencedBulk hose length quotedRequest a finished-assembly offer from B
Specified linerGrade identified“PTFE” onlyAsk B to identify the offered construction
Both end connectionsA and B part references listed“Standard fittings”Obtain both end references and deviations
Required inspection recordListed separately“Tested”; record unspecifiedConfirm method, coverage and delivered record
End capsIncludedOptionalRequest the optional scope in B’s revised total
Service conditionsResponse still pendingResponse still pendingHold technical acceptance of both offers

Offer A is more explicit, but it is not automatically suitable: its service confirmation is still open. Offer B may become comparable after clarification. Do not assign a penalty price to an unknown technical omission and call it equivalent. Ask for a revised offer that resolves the omitted scope, then preserve both the original and revised versions.

Normalize commercial scope after technical clarification

For technically acceptable offers, compare the same quantity of complete assemblies and the same delivery basis. Record currency, quotation validity, minimum quantity, packing, inspection charges, tooling or setup, and any buyer-responsible transport items. Keep optional alternatives separate from the compliant base offer.

A comparison total can combine the quoted base amount and confirmed mandatory extras, with separately identified delivery items where needed. Add only evidenced amounts; leave unresolved charges visible. A lower base price is not a demonstrated saving when required ends, records or packing have no confirmed price.

Ask when the delivery clock starts: order receipt, drawing approval, material confirmation or another stated event. Compare the promised deliverable date and its dependencies, not just a headline lead time. Record any proposed substitution as a deviation requiring the designated engineer’s acceptance.

Close the review with a traceable decision

Use four practical statuses: matched; approved deviation; clarification required; excluded. Give each unresolved line an owner and required response. Technical approval should identify the accepted configuration and service response. Purchasing approval should identify the commercial revision being ordered. Neither should depend on an undocumented telephone assumption.

Carry the accepted BOM, drawing revision, inspection deliverables and exception list into the purchase order. During receipt, compare the assembly identification and delivered records against that agreed package. A component change after quotation should trigger an updated review before it becomes an unnoticed production substitution.

Frequently asked questions

Can two hoses with the same nominal diameter be compared directly?

Only after the construction and complete scope are aligned. The nominal size does not specify liner grade, actual bore requirements, end connections, finished geometry or documents.

Is an unspecified certificate included?

No inclusion should be assumed. Ask for the document type, scope, traceability and any charge or delivery dependency in writing.

Should the cheapest offer always be rejected if it has missing details?

No. Request clarification first. Missing detail prevents a reliable comparison; it does not prove that the supplier cannot meet the requirement.

Request an itemized PTFE hose assembly quote

Review Pengrowth’s stainless steel braided PTFE hose options, then send the completed worksheet, drawing revision, quantity and operating conditions for review. Identify required inspection records and packing separately so their availability and inclusion can be confirmed for your order.

Review PTFE Hose Assembly Options and Quote Requirements

Request a Braided PTFE Hose Quote

Send hose ID, assembly length, pressure, temperature, media, braid grade, fitting types, quantity and destination so quotations can be compared on the same technical basis.

Send Hose Specifications