CUSTOM SEALING COMPONENTS

PTFE Gaskets & Washers

Custom PTFE gaskets, washers, rings, spacers and non-standard sealing profiles cut or machined from virgin and filled PTFE.

Cut to drawingVirgin or filled PTFEMetric & imperialPrototype quantitiesBatch inspection

Custom cut and machined PTFE sealing components prepared in a production batch.

PRODUCT OVERVIEW

Custom Production for Drawing-Based Requirements

Pengrowth has manufactured PTFE products since 1997. Our 8,500 m² facility supports extrusion, compression molding, sintering, skiving, turning, cutting, drilling and CNC machining for prototypes, small batches and repeat orders.

Standard and non-standard sizes

Round, rectangular, slotted, stepped and irregular gasket profiles can be produced from a drawing, sample or dimension list.

Material matched to service

Virgin PTFE supports broad chemical service. Filled materials may be reviewed for wear, load, deformation, thermal transfer or anti-static requirements.

Flexible production routes

Gaskets and washers can be cut, turned, drilled, milled or machined from sheet, rod, tube or molded blanks according to thickness and geometry.

SPECIFICATION REVIEW

Information for Material Selection and Quotation

ItemAvailable guidance
Required dimensionsInside diameter, outside dimensions, thickness, holes, slots, bolt pattern, surface requirement and tolerance.
Material optionsVirgin PTFE, glass-filled, carbon-filled, graphite-filled, MoS2-filled, bronze-filled, anti-static and wear-modified PTFE.
Typical tolerance guidanceAchievable tolerances are confirmed after reviewing geometry, material, functional dimensions and the inspection method.
Production methodsCutting, turning, drilling, CNC machining, molding and sintering.
Order quantitySingle samples, low-volume replacement parts, small batches and production orders.
Lead timeSample and production lead times are confirmed after reviewing material, dimensions, process, quantity and inspection requirements.
PRODUCTION & QUALITY

From Drawing Review to Traceable Shipment

Review the requirement

Confirm drawing, material grade, dimensions, tolerance, quantity and operating conditions.

Select stock and process

Choose resin or filled compound, stock form and the appropriate molding, sintering or machining route.

In-process inspection

Dimensions, appearance and flatness are sampled during molding, extrusion and CNC production.

Finished-part inspection

Check tolerance, surface finish, visible pores, cracks and drawing-specific requirements.

Performance sampling

Wear, temperature, insulation or sealing checks can be arranged according to the order requirements.

Packing and traceability

Final packing inspection, batch traceability and an outgoing inspection report are available.

APPLICATIONS

Typical Industrial Uses

Chemical flange sealing

Provide the flange drawing, gasket ID, OD, thickness, bolt pattern, medium, temperature and pressure for sealing-material review.

Valve and pump seals

Specify the seal geometry, mating surfaces, movement, medium, temperature and pressure; identify critical sealing dimensions.

Electrical insulation washers

Send the washer profile, thickness, hole dimensions and electrical acceptance requirements; confirm the grade and inspection scope.

Food-processing equipment

Identify product-contact conditions, cleaning media, temperature and required compliance documents before selecting the gasket grade.

Laboratory and analytical systems

State the contacting chemicals, operating conditions, joint geometry and dimensional requirements; include required cleanliness or documentation.

OEM machinery and maintenance parts

Provide the part drawing or dimensioned reference, assembly function, quantity and revision; distinguish a sealing gasket from a spacing washer.

ASSEMBLY REVIEW

Specify the sealing joint, not only the gasket dimensions

A gasket has a sealing function in the assembled joint. A washer may instead provide spacing, load distribution or electrical insulation. State the intended function so material, thickness, surface requirements and critical dimensions can be reviewed accordingly.

Flange and clamping conditions

Send flange geometry, sealing-face condition, bolt pattern, fastening arrangement and intended clamping or compression conditions. Identify whether thickness refers to the free part or the installed state.

Complete operating duty

Include medium and concentration, continuous and peak temperature, pressure or vacuum, operating cycles and cleaning conditions. A material description alone does not approve the finished joint for leak-tight service.

Agreed acceptance requirements

Define any required leak test, test medium, conditions, acceptance criteria and records before quotation. No universal tightening torque or pressure rating is promised for all PTFE gaskets.

FAQ

Frequently Asked Questions About PTFE Gaskets and Washers

Can you make a PTFE gasket from my drawing or sample?

Yes. Send a dimensioned drawing, CAD file or physical sample with quantity, material and application requirements.

Is virgin or filled PTFE better for a gasket?

Virgin PTFE is commonly selected for chemical resistance and clean sealing. Filled PTFE may be considered when load, wear, deformation or thermal behaviour is more important.

What gasket dimensions are needed for a quote?

Provide ID, OD or outside profile, thickness, hole or slot dimensions, tolerance, quantity, pressure, temperature and chemical medium.

Can you supply prototype or low-volume gaskets?

Sample availability, cost and shipping conditions are confirmed during RFQ review.

Machining Evidence for PTFE Gaskets and Washers

These images show Pengrowth manufacturing resources used for drawing-based PTFE components. Geometry, material and inspection requirements are reviewed against your drawing before production.

CNC machining area for custom PTFE components
CNC machining area for custom PTFE components
Machined PTFE components for drawing-based production
Machined PTFE components for drawing-based production

Send Your Drawing for a Manufacturability Review

Sample and production lead times are confirmed after reviewing material, dimensions, process, quantity and inspection requirements.

Send Specifications